APAS
Projects
- Renovation of Barangay
Health Center at a costs of P 600,000.00
in 1999.
- Purchase and opening
of access road to Sitio Panabang in
1999.
- Purchase and opening
of access road to Sitio Rotunda Mahiga
in 2000.
- Asphalting of road
at Sitio San Miguel to Winnie Geonzon
St. in 2000.
- Concreting of Basketball
Court at P-6, San Miguel in 2001.
- Purchase of Dumptrack
in 2001.
- Concreting of pathways
within the internal parts of sitios.
- Installation of Street
Lights since 1964 and replacements
of busted ones to present.
- Installation of Fire
Hydrants of Sitio Baca, Upper Stephenson,
and San Miguel in 2000 and 2001.
- Repair and maintenance
of Busay Tawagan road, renamed as
Cebu Veterans Drive, since 1974 to
present.
- Constructed the concrete
pathway at PC Gas Dump (Maracas) 25
meters long, 3 meters long wide at
costs of P 6,000.00 in 1983.
- Construction of concrete
pathway at La Guardia Extn. 25 meters
long and 1 meter wide in 1996.
- Renovation and concreting
of Basketball court at PC Hills.
- Installation of main
water pipeline at La Guardia in 1984.
- Asphalting of feeder
road at UCMA Village from corner Salinas
Drive at a costs of P 80,000.00 in
1989.
- Construction of Brgy.
Multi Purpose Hall and Sports Complex.
- Asphalting of Atty.
Winnie Geonzon road which was completed
in 1990 at a costs of P 100,000.00.
- Construction of open
drainage canals at Col. Toralba St.
from corner of Wilson Street.
- Riprapping of canals
from San Miguel to Sitio Baca, Apas
fro the funds of Congressman del Mar,
800 meters long.
- Construction of Waiting
Sheds in 1994.
- Cementing the access
road to Calvary Hills in 1997.
- Construction of drainage
at La Guardia in 1993.
- Installation of Street
Lights since 1964 and replacements
of busted ones to present.
- Installation of Fire
Hydrants at Sitio Baca, Upper Stephenson,
and San Miguel in 2000 and 2001.
|
|